28 April 2008

Container Concrete


Not only was the front apron of concrete being formed up this morning. Around the corner, Bob and Alan were hard at work ensuring that there is formwork prepared and ready for the delivery of concrete so that there will be an all weather path from the The Shed to the Storage Container.

No longer will Wellies or waterproof boots be required to go and fetch that important piece of wood for your project no longer the stepping stone hop to the fetch a piece of rod from the container.

Well done guys !!!

No comments: