Kevin, Jim & Doug were hard at work this morning putting up the gyprock.
Peter and Wally returned from a visit to the local High School surveying with some envy, the equipment and layout of their workshop.
Peter was amazed that the lining of the Engineering Annex had progressed from one sheet set in place to the entire Annex almost fully lined by the end of the shed morning.
Doug has done such a brilliant job that he will start on the main shed next ... gyprock already waiting ... it will be done in a flash !!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment